Collage pictures of many performers doing circus tricks
TOP
.
THESE NOTES ARE IN THE FILE : https://docs.google.com/document/d/1HC_yY0fSrl4R7AzVW2SgEP19gqvPXf3XBU8YsjEXfhU/edit?usp=sharing ON AC GMAIL
TOWING CHECKLIST
* Towing MIRRORS on * Jockey wheel UP * Tow Hitch Locked * 2x Safety chains connected * Trailer Handbrake OFF * LIGHTS CHECKED * POWER brakes checked

EAGLE

DOVE
Print this file
SETUP
Disconnect and Stabilise * Caravan levelled left to right. (wheel packers) * Jockey wheel down/installed. Foot in place. * Caravan handbrake on. * Tow coupling, safety chains & 12Vt plug disconnected * Caravan levelled front to back. (Jockey wheel) * Stabilisers down & feet in position. WINDING * roof unlatched x4 TRIPLE CHECK * ¼ Wind Roof Unzip and drop AWNING + BED flies * ¾ Wind Roof walk around and check poles are fluid * WIND ROOF *Install 2 corner Supports BEDS *Pull BEDS install supports * 4 *Loose bring out bed canvas *INSIDE BED Hockey Stick *OUTSIDE bed cover velco on under DOOR * Bring down, insert on PINs - push top * Clip all - wrap canvas REMAINING *AWNING all poles and pegs *BED FLIES assemble *240Vt Electrical extension lead connected. *Water supply fittings & hose connected & turned on. (minimise pressure) *Sullage hose connected/Bucket in place. *Tow hitch security device fitted & locked. *Gas bottle turned on.
PACKUP
INSIDE * Fridge door latched * Stove top down * Benches clear, cupboard latched. * All lights off UNPLUG * Door UP CLOSE * Canvas folded & pole removed. * Beds pushed in * Roof closed & latched. * Bed fly packed ULTILITES REMOVED - sullage / hose / power lead / Gas OFF * Winder crank stored * Stabilisers up & feet stowed. * Levelling devices stowed. * Boot closed * Caravan door locked. * Step Stowed
NAME
TARE
LOADED
EAGLE (Body length 4m)
1100
415
SWIFT
890
385
SWAN
1190
???
LARK
1030
415
DOVE
925
375
SETUPO EAGLE ORIGINAL AWNING+ANNEX
1./ POLES: Get out of bag, note they are all color colded. There is one with BLACK tape and says "TIGHT" , use this last in the middle 2./ Setup awning (2 corner upright through crossbar and wingnuts, then use spring poles). 3./ ANNEX: A) Slide into SAIL RAIL first B) Do the mechanical eyelet attachments C) then VELCRO
MISC PICS
  • 35 MOST POPULAR JAYCO CAMPER TRAILER MODIFICATIONS  
  • 23 TIPS FOR NEW JAYCO CAMPER TRAILER OWNERS  
  •  
  •  
  •  
CABLE REPLACEMENT
HOW TO FIX A JAYCO WIND UP LIFT SYSTEM (BROKEN MAIN CABLE)  
Cables : Main cable to winch : 5mm , the 4 ones to poles: 2.5mm SUGGESTED: WIRE ROPE Aircraft cable, 3mm 7x19 Grade 2070 (someone also said Fibre core is the way to go.) Need around 2.5m of the 5mm and * 6mm stainless steel welded eyebolts.